Project Details : Al-Wakrah World Cup stadium in Qatar for 2022
Project

Al-Wakrah World Cup stadium in Qatar for 2022

The site is located in Al Wakra. The scope of works for this package consists of engineering, fabrication, supply, delivery, installation, testing &commissioning and warranty of Potable, Fire, TSE, Surface & Foul Water Pipe Networks and Accessories for External Utilities including but not limited to; Provide engineering works which include but not limited to preparation of shop drawings, as built drawings, method statement for the installation work, materials submittals and all other quality deliverables; Supply & installation of all Ductile Iron pipes, fittings, valves and accessories & thrust block to complete all the installation works for the External Fire and Potable water networks as per approved shop drawing & details for complete functioning system and as per Kahramaa approved vendor list; Supply & installation of VC, uPVC, HDPE Pipes, fittings, including thrust block for TSE, Surface water & Foul water networks; Supply of installation of all valves and mechanical fittings including spindles & marker posts; Supply and installation of heavy duty covers with frame and GRP ladders for manholes and valves chambers; Supply & installation of Fire hydrants with Bollards, key, bends, etc. Supply & installation of Precast manholes lined with GRP liner 6mm thick and externally coated with 500 micron coal tar epoxy and EPDM rubber ring for jointing between parts, all in accordance with specification and QCS2014; Supply of civil materials for the valves chambers (concrete, rebars, forms, waterproofing, ladder, etc.); Supply & installation of precast concrete Soak way & Gullies as required; Supply of Heavy duty GEO Cellular tanks; Hydro testing as per Kahramaa procedures / Standards; Gravity Test as per Ashgal Procedures and Standards; All machineries (i.e, cranes, excavators, wrapping machines, welding machines, etc.) Testing and commissioning. Project Start: 24 July 2017 Completion Date: April 2018. Project value: Around 50,000,000 QR

  • date
    09/20/2017
  • Categories

    Infrastructure Utilities